Warning: mkdir(): No space left on device in /www/wwwroot/T1.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/zskml.com/cache/f6/5646f/1127b.html): failed to open stream: No such file or directory in /www/wwwroot/T1.COM/func.php on line 115
Spray painting wastewater treatment plan批發,Spray painting wastewater treatment plan供應,Spray painting wastewater treatment plan生產廠家詳細介紹_Henan Lanyi Intelligent Technology Co., Ltd






  • 蜜桃视频APP在线观看,蜜桃视频APP色版网站,蜜桃视频APP污版,蜜桃视频IOS免费直播APP

    + WeChat:切換按鈕及底部微信

    Welcome to visit the website of Henan Lanyi Intelligent Technology Co., Ltd

    Contact 13323711188

    You Are Here:Home> Product Center >Technical Solution>Industrial wastewater technology scheme
    Spray painting wastewater treatment plan

    Spray painting wastewater treatment plan

    Spray painting wastewater mainly comes from the wastewater generated by the workshop for painting and coloring the items to be painted. Spray paint wastewater is one of the industrial wastewater that is difficult to treat due to its high concentration, large pigment content, diverse types, and low water volume.

        Spray painting wastewater mainly comes from the wastewater generated by the workshop for painting and coloring the items to be painted. Spray paint wastewater is one of the industrial wastewater that is difficult to treat due to its high concentration, large pigment content, diverse types, and low water volume. So, why not treat this difficult spray paint wastewater and let it harm our ecological environment at will? Of course not! When dealing with spray paint wastewater, it is necessary to pay attention to methods and not blindly treat it, otherwise it will backfire. So let Blue One Environmental Protection, who has many years of experience in sewage treatment, explain to us the treatment plan for spray paint wastewater.
        Process diagram of spray painting wastewater

        The production wastewater first enters the grid well, flows automatically to the regulating tank, is pumped into the phenol passivation equipment by the lifting pump, and undergoes drug phenol passivation decomposition treatment. After treatment, the water flows into the A/O secondary biological oxidation tank for deep biochemical treatment to achieve purification effect, and then flows into the sedimentation tank for secondary sedimentation. The clear water after sedimentation flows into the clear water tank through the drainage weir, and is filtered by the multi-media filtration equipment to meet the production reuse standard. The sludge at the bottom of the primary sedimentation tank and sedimentation tank is filtered by a sludge lift pump through a filter press, and the filtered sludge is squeezed into dry cakes for further processing;

    • Telephones:0371-88912366 0371-88912399

    • Service Hotline:4006096637(technology)

    • Address:Unit 303, Building 5, Zhangwuzhai No.2 Courtyard, Sequoia Road, Zhengzhou High tech Zone, Henan Province

    • Add WeChat

    Copyright Notice: The content published on this website may not be downloaded, reproduced or mirrored without the permission of this website and the author. Violators will be held legally responsible by this website.
    網站地圖